Ghaam.

Solar Co. — Pune, since 2014

Rooftop solar · Homes, housing societies & small factories · Pune, PCMC & Satara

Your roof sees 300 sunny days a year. It should be paid for them.

We're a team of 38 electricians and engineers who design, install and look after rooftop solar across Pune. No call centre, no subcontractors, no mystery line items — one crew from survey to net meter, and the same crew if anything ever goes wrong.

2,140

rooftops wired since 2014

11.6 MW

feeding the MSEDCL grid

4.8 / 5

from 612 Google reviews

Snapshot · Kothrud · 14 Mar, 2:40 pm

6.2 kW

coming off the Deshpandes' 7 kW roof. Their meter was running backwards by lunch.

₹78,000
subsidy.
We do the paperwork.

One real bill · Baner · June 2024 vs June 2025

₹4,860

₹310

That's Meera Kulkarni's MSEDCL bill, the month before and a year after we put 5.4 kW on her terrace. The ₹310 is the fixed charge — everything else came off the roof.

Job card #GS-1987 — Kulkarni residence

System

5.4 kW · 12 × Waaree 450 W

Inverter

Growatt 5 kW on-grid

Price before subsidy

₹3,24,000

PM Surya Ghar subsidy

− ₹78,000

Pays for itself in

4 yrs 2 mo

Survey to switch-on: 23 days. Net meter fitted on day 19.

Who we build for

Three kinds of roof. One way of doing them.

Every job gets a site survey with a shade analysis, a structural check and a single-line drawing before we quote a rupee. You'll see the same drawing on the day we install.

01

Bungalows & row houses

Most families in Pune run between 300 and 600 units a month. A 3–5 kW system on a flat terrace usually covers it, with room left for the water tank and the clothesline.

2–10 kW · subsidy eligible · ~1 day on site

02

Housing societies

Lifts, pumps, corridor lights and the clubhouse — the common-area bill is the one every committee argues about. We present to the AGM, handle the resolution paperwork and fit around residents' terrace access.

10–150 kW · GHS subsidy eligible · 3–7 days on site

03

Workshops & small factories

If your machines run in daylight, solar is the cheapest power you'll buy. We size to your daytime load from twelve months of bills, and work weekends so the line doesn't stop.

25–500 kW · accelerated depreciation · Chakan, Bhosari, Talawade

“

They said 21 days. It took 19, MSEDCL inspection included. I've genuinely stopped opening the electricity bill.

Anil Joshi

Aundh · 6.3 kW · switched on Nov 2024

From first call to first unit, in about a month.

Day 1–3

Roof survey

An engineer visits, measures, checks shade at 9 am and 4 pm, and looks at your last 12 bills.

Day 4–6

Drawing & fixed quote

A layout, a generation estimate and one price. It doesn't change after you sign.

Day 10–14

Installation

Our own crew, usually done in a day. We leave the terrace cleaner than we found it.

Day 18–30

Net meter & subsidy

We chase MSEDCL and file on the PM Surya Ghar portal. The subsidy lands in your bank.

On our roofs

Waaree · Adani · Tata Power Solar panels

Growatt · Sungrow · Enphase inverters

Hot-dip galvanised, 150 km/h wind-rated frames

MNRE-empanelled vendor

Send us a photo of your roof. We'll tell you what it's worth.

A rough estimate on WhatsApp within a working day, or a free site survey anywhere in Pune, PCMC or Satara. Either way, nobody will call you eleven times.