Solar Co. — Pune, since 2014
Rooftop solar · Homes, housing societies & small factories · Pune, PCMC & Satara
We're a team of 38 electricians and engineers who design, install and look after rooftop solar across Pune. No call centre, no subcontractors, no mystery line items — one crew from survey to net meter, and the same crew if anything ever goes wrong.
rooftops wired since 2014
feeding the MSEDCL grid
from 612 Google reviews
Snapshot · Kothrud · 14 Mar, 2:40 pm
coming off the Deshpandes' 7 kW roof. Their meter was running backwards by lunch.
₹78,000
subsidy.
We do the paperwork.
One real bill · Baner · June 2024 vs June 2025
That's Meera Kulkarni's MSEDCL bill, the month before and a year after we put 5.4 kW on her terrace. The ₹310 is the fixed charge — everything else came off the roof.
Job card #GS-1987 — Kulkarni residence
System
5.4 kW · 12 × Waaree 450 W
Inverter
Growatt 5 kW on-grid
Price before subsidy
₹3,24,000
PM Surya Ghar subsidy
− ₹78,000
Pays for itself in
4 yrs 2 mo
Survey to switch-on: 23 days. Net meter fitted on day 19.
Who we build for
Every job gets a site survey with a shade analysis, a structural check and a single-line drawing before we quote a rupee. You'll see the same drawing on the day we install.
01
Most families in Pune run between 300 and 600 units a month. A 3–5 kW system on a flat terrace usually covers it, with room left for the water tank and the clothesline.
2–10 kW · subsidy eligible · ~1 day on site
02
Lifts, pumps, corridor lights and the clubhouse — the common-area bill is the one every committee argues about. We present to the AGM, handle the resolution paperwork and fit around residents' terrace access.
10–150 kW · GHS subsidy eligible · 3–7 days on site
03
If your machines run in daylight, solar is the cheapest power you'll buy. We size to your daytime load from twelve months of bills, and work weekends so the line doesn't stop.
25–500 kW · accelerated depreciation · Chakan, Bhosari, Talawade
“
Anil Joshi
Aundh · 6.3 kW · switched on Nov 2024
Day 1–3
An engineer visits, measures, checks shade at 9 am and 4 pm, and looks at your last 12 bills.
Day 4–6
A layout, a generation estimate and one price. It doesn't change after you sign.
Day 10–14
Our own crew, usually done in a day. We leave the terrace cleaner than we found it.
Day 18–30
We chase MSEDCL and file on the PM Surya Ghar portal. The subsidy lands in your bank.
On our roofs
Waaree · Adani · Tata Power Solar panels
Growatt · Sungrow · Enphase inverters
Hot-dip galvanised, 150 km/h wind-rated frames
MNRE-empanelled vendor
A rough estimate on WhatsApp within a working day, or a free site survey anywhere in Pune, PCMC or Satara. Either way, nobody will call you eleven times.